Home › Tools › First-start checklist
LS swap first-start checklist
Everything to check before you crank a swapped LS for the first time. Print it, tick it off in the garage, and keep it with the build.
Engine: ____________ Computer: ____________ Date: ________
Engine and fluids
- Oil filled to the full mark, with a new filter.
- Oil pressure first: crank it with the fuel pump fuse or relay pulled until the gauge shows pressure, then put it back.
- Coolant filled, and the steam tubes routed to a port (a radiator steam port, a tapped water pump or a heater-hose fitting).
- Transmission fluid filled. Shifter connected, in Park or Neutral, with the range switch plugged in.
- Belt on and every accessory turns. Fan, hoses and wiring clear of the headers and the steering.
Power and grounds
- Battery charged: at least 12.0 V before you crank.
- Every computer ground on a clean engine ground, plus engine-to-frame and engine-to-battery grounds. Coil harness grounds bolted down.
- Constant battery power and key-on power to the computer. The key-on feed has to stay at battery voltage the whole time you crank (meter it while someone cranks); one that drops out in crank is a classic no-start.
- Fuel pump relay wired: on a GM computer the computer feeds +12 V to the relay coil (fans are the ones it grounds). The pump runs about 2 seconds at key-on, then stops until the computer sees the engine turning. Listen for it.
- Fuel pressure checked at the rail with a gauge, to the spec for your rail and regulator (55–62 psi on a factory LQ9 truck system). Relay wiring.
Sensors and connectors
- Every injector and coil connector seated and locked.
- Crank, cam, MAP, MAF, intake air temp, coolant temp, throttle and knock sensors plugged in. O2 sensors in or turned off in the tune.
- Crank sensor and computer match: 24x with a 24x computer, 58x with a 58x one. Not sure which computer you have?
- Key on, engine off: throttle position reads 0 and sweeps to nearly 100% at full pedal; MAP reads about 95–102 kPa at sea level (lower at altitude).
- Drive by wire: pedal and throttle body both plugged in. Cable: the throttle opens fully and returns.
The tune
- Know what is programmed in the computer before you crank. Firing an unconfigured swap risks damage.
- VATS turned off in the tune.
- Starter circuit checked: the donor's starter control wired the way the tune expects (some P59 and E38 trucks run the start relay from the computer) or the car's own start circuit, through the neutral or clutch safety switch, with power in START. Turning off a starter-relay trouble code doesn't fix missing start power or authorization.
- Calibration matched to the equipment actually on the engine, using the requirements for your exact computer and harness. Keep the emissions equipment your donor and state need, and confirm the wiring and calibration before you leave purge or vent circuits off.
- Bigger cam? It needs more startup air to catch on first fire.
First fire
- Fire extinguisher in reach, someone watching for leaks, laptop or scan tool connected and logging.
- Watch oil pressure right away. Shut it off if there is none.
- Let it warm up, watch coolant temperature, and top off the coolant as air works out.
- Cranks but won't start? Check key-on power during crank, fuel pressure, the crank signal and VATS, in that order.
lsswapbible.com/tools/first-start-checklist/
Let us do the tune part. A Full Custom ($199) gets it started and driving: injector data, idle, fans, conservative fuel and spark, and VATS off if you ask. Built on a read of your computer (reading needs no credits).